Showing posts with label bathroom renovation. Show all posts
Showing posts with label bathroom renovation. Show all posts

Thursday, December 18, 2014

Budgeting a Bathroom Renovation

finished_bath

So now that we’re approaching the middle of Upstate New York’s wonderful winter season, you’re probably ready for a change in scenery, since you’ve been “stuck” inside for weeks. A lot of homeowners opt for indoor renovation projects in the winter, and we see an increase in the amount of quote requests for bathroom projects. So for this month, let’s talk bathrooms!

Crunch the Numbers


According to Remodeling Magazine’s 2014 Cost vs. Value report, a mid-range bathroom remodel might run you somewhere in the neighborhood of 15.8 thousand dollars. Before you lose your mind over that figure, consider that your investment will vary greatly depending on how you define “mid-range,” the size of your space, and numerous other factors. In the end, the amount you spend may actually be much less. A good place to start is with an honest evaluation of your finances. Come up with a number that you are feasibly able to spend on the project. The National Association of the Remodeling Industry (NARI) has a budgeting worksheet to make this step a breeze.

Let’s next consider how long you plan on staying in your home. This can give you a better idea of how valuable this project should be to you. If you plan on staying for less than five years, consider your project an improvement on investment, and consider how you can best improve the value of your home and improve its ability to sell. If you’re planning on staying more than five years, it’s acceptable to consider the comfort of you and your family over the ability of your home to sell.

Substitutions and Omissions


When you budget for a bathroom project, it’s important to remember to include labor costs. As a general rule, a third of your budget will be put towards labor.

Should you find that your budget needs a trim, start with the extras (a towel warmer, steam shower, etc.). From there, consider some other investment options, such as having an old tub re-glazed versus buying a brand new one. If you’re planning on changing the layout of the room, the plumbing is a big cost than might be able to be omitted by keeping the layout the same.

Leave Yourself Leeway


When you open up the walls and floors of any home, surprises tend to pop up. Plan for these little surprises by leaving some cushion in your budget to accomodate. Last minute changes are also a source for budget-busting costs, so try to finalize your plans before project start, and keep mid-project revisions to a minimum if at all possible.

On top of your labor costs, set aside 10 percent to cover the cushion. If you don’t use it, you’ll have ample funds to buy the little luxuries (towel warmers, fluffy towels, a nice massaging shower head, etc.).

Keeping On Budget


Once you’ve finalized your project, keep a spreadsheet to track actual expenses against what’s been budgeted. When you can visualize the impact on your project’s bottom line, you’re less likely to go over.

Source: http://www.trinityhomerenovations.com

Sunday, April 13, 2014

From Lavender To Luxury — New Bathroom Remodel

before-after-irond-batrhoom

These homeowners in Irondequoit used to have a dated bathroom with lavender counters and outdated fixtures.

Trinity was chosen as the bathroom remodeling contractor and we essentially gutted the entire space and installed:

  • A new bathtub

  • Shower fixtures

  • Vanity

  • Granite counter

  • Electrical & plumbing

  • Bath fan

  • Window & paint

  • Custom ceramic tile

The photo you see here is just one picture, of the sink/vanity area. You can see all the photos in their entirety in our Photo Gallery section.

What do you think of this new bathroom? Leave us a comment!

Source: http://www.trinityhomerenovations.com

Friday, December 20, 2013

Before & After: Pittsford Bathroom Renovation

Our team recently headed to Pittsford to tackle this doozie of a bathroom. Check out that funky turquoise tile and wallpaper!

Trinity worked on this complete renovation, updating it from the 1970's to 2013.  The bathroom was completely gutted and rebuilt. We installed new tile, all new plumbing lines and electrical as well as the tub/surround and granite countertops.

What do you think? We'd love to hear your feedback!

Here are all the pictures if you want to view them in detail.

Also, a snippet from the customer who owns the home:
"We highly recommend John and his company. I cannot say enough good things about our experience.   We have several more projects to do, and we are delighted that John is willing and able to do them.  He and his crews are truly a blessing to us."

Diana and Rollie Adams, Pittsford NY 

View All Our Testimonials >

pittsford-bathroom-before-after2 pittsford-bathroom-before-after1

Source: http://www.trinityhomerenovations.com